Power Testing Equipment
Product Overview
A load bank applies a controlled load so commissioning teams can evaluate how equipment responds under specified test conditions. For data center projects, the choice starts with where the load will be applied and what the test needs to verify.
● System-level power testing applies load at the generator, UPS or distribution test point.
● Rack-level load simulation places test loads at cabinet positions to represent planned IT power demand.
● Liquid cooling testing applies a thermal load to the coolant loop so the team can evaluate the cooling system under defined conditions.
Specify the test point, voltage, load profile and control requirements before selecting equipment. For liquid cooling tests, also define the heat load and coolant connection conditions.
Product Series
Data Center Rack Load Banks
| Model or Configuration | Listed Load | Listed Supply |
| MT-AC/DC4KW | 4 kW | AC/DC configuration |
| MT-AC/DC12KW | 12 kW | AC/DC configuration |
| MT-5KW220V | 5 kW | 220 V AC |
| 230 V AC Rack-Mounted Load Bank Group | Confirm for the selected unit | 230 V AC |
Liquid Cooling Test Load Banks
Technical Specifications
| Model / Series | Rated Load | Rated Voltage | Power Factor | Control Mode | Dimensions | Weight | Operating Temperature |
| 1,000–2,000 kW Power System Series | 1,000–2,000 kW | 400–690 V AC | 1 | — | — | — | — |
| MT-100KW Portable Load Bank | 100 kW | — | — | — | — | — | — |
| MT 400 kW Manual Load Bank Series | 400 kW | 400 V AC | 1 | Manual control | — | — | — |
| MT 500–1,000 kW Operator-Console Series | 500–1,000 kW | 400 V AC | 1 | Operator-console configuration | — | — | — |
| MT-R600KW | 600 kW | 400 V AC | 1 | Local manual and operator-console control | 1,500 × 1,500 × 2,000 mm | 2 t | −10 to +55 °C |
| MT-MV-3000KW | 3 MW | 10.5 kV | — | Remote laptop control | 6,058 × 2,438 × 2,591* | 7 t | −35 to +55 °C |
| MT-MV-2500KW-20KV | 2.5 MW | 20 kV | — | Remote laptop control | 9,000 × 2,438 × 2,896* | 12 t | −10 to +55 °C |
| MT-MV3150KVA-10.5KV | 3,150 kVA / 2,500 kW† | 10.5 kV | 0.8† | Remote laptop control | 9,000 × 2,438 × 2,896* | 12 t | −10 to +55 °C |
Testing Applications
- Generator Load Testing:
- UPS Load Testing:
- Battery Discharge Testing
- Power Distribution System Testing
| Application | Test Purpose | Reference Conditions |
| Row Power Distribution Cabinets | Apply the planned load to the cabinet and downstream rack feeds. | 220 V AC reference configuration covering 1,000 racks and 5,000 kW of test load. |
| Switchgear | Evaluate the switchgear under the current specified for the test. | 250–6,300 A at listed voltages of 440 V, 690 V, 6.6 kV and 10.5 kV AC. |
| Transformers | Apply the load specified for the transformer test. | 1,000–10,000 kW, with listed configurations at 400 V AC and 10.5 kV AC. |
| Busway | Apply the target current to the busway section under test. | 100–10,000 A at listed voltages of 400 V, 690 V, 6.6 kV and 10.5 kV AC. |
Request a Quote
Tell us what you need to test, the target load at each test point and your commissioning schedule. For rack-level or liquid cooling tests, include the number of rack positions and the required load per rack. This information helps us identify a configuration for your project.